GALLERY: DTE Lift May 2024
Edgewood Electric and L.S. Brinker were on-site at DTE Headquarters in Detroit, hoisting over a dozen pieces of new electrical equipment, each weighing up to 14,000 lbs., through an opening in the side of the building.
This process required strict attention to detail and extensive coordination between personnel from DTE Energy, L.S. Brinker, Edgewood Electric and lift contractor, Capital City Group, to ensure the safety and successful completion of the project.